What the compressor volumetric efficiency calculator calculates
The compressor volumetric efficiency calculator works out how much of a reciprocating compressor’s piston displacement actually reaches the receiver as free air. From the cylinder bore, stroke, number of first-stage cylinders, single- or double-acting construction, rod diameter and speed it calculates the displacement in m³/min and cfm. From the first-stage discharge pressure, atmospheric pressure, clearance volume and re-expansion exponent it calculates the theoretical volumetric efficiency that clearance alone allows. From a measured free air delivery (FAD) it calculates the actual volumetric efficiency and the size of the remaining losses.
Plant engineers use it to check whether an ageing piston compressor still delivers its rated air, and buyers use it to compare a displacement figure with a real FAD figure before buying a used machine. The result separates the loss the design builds in from the loss caused by wear, heat and slipping drives.
What volumetric efficiency means for a piston compressor
Volumetric efficiency is the ratio of the free air a compressor delivers to the volume its pistons sweep in the same time. Displacement is a geometric figure: bore area multiplied by stroke, cylinders and speed. Free air delivery is a measured figure: the air actually delivered at the discharge, restated to inlet conditions. FAD is always less than displacement, and the difference is the subject of this page.
Two compressors with the same displacement can deliver quite different FAD, so always compare FAD with FAD at the same pressure.
Why FAD is less than displacement: clearance and other losses
FAD is less than displacement because clearance volume, suction heating, valve pressure losses, leakage and drive slip all reduce the air drawn in on each stroke. Clearance volume is the space left between the piston and the cylinder head at the end of the stroke, including valve pockets.
At the end of each delivery stroke the clearance volume stays full of air at discharge pressure. On the return stroke that air re-expands, and the suction valve cannot open until cylinder pressure falls below inlet pressure. The higher the pressure ratio, the further the trapped air must expand, and the more of the stroke is lost.
The calculator groups the remaining losses as “other losses”:
- Suction heating: hot cylinder walls and valves warm the incoming air, so each stroke holds less mass.
- Valve pressure losses and throttling: springs, plates and passages cause a pressure drop on suction, so the cylinder fills below inlet pressure.
- Ring and valve leakage: worn rings let air pass the piston and leaking valves let delivered air flow back.
- Belt slip or low speed: a machine running below its nameplate speed sweeps less volume than the calculation assumes.
Method and formulas
The calculator combines swept-volume geometry, the clearance re-expansion equation and the measured FAD.
- Swept volume, single-acting: Vs = π/4 × D² × L, where D is the bore and L the stroke, both in metres.
- Swept volume, double-acting: add the crank end, π/4 × (D² − d²) × L, where d is the piston rod diameter.
- Displacement: Q = Vs × number of first-stage cylinders × rpm, in m³/min. Multiply by 35.3147 for cfm.
- Stage pressure ratio: r = (discharge bar g + atmospheric bar a) ÷ atmospheric bar a.
- Clearance (theoretical) volumetric efficiency: VEc = 1 − c × (r^(1/n) − 1), where c is the clearance volume as a fraction of swept volume and n is the re-expansion exponent.
- Measured (actual) volumetric efficiency: VEm = measured FAD ÷ displacement.
- Other losses: VEc − VEm, in percentage points.
Only first-stage cylinders are counted, because the first stage alone draws in free air. The calculator warns when measured efficiency exceeds 100% (impossible) or the clearance figure (check the inputs), when clearance efficiency is zero or below (the stage delivers nothing), and when measured efficiency is below 50%.
Clearance volumetric efficiency by discharge pressure
Clearance volumetric efficiency falls steadily as discharge pressure rises: at 5% clearance and n = 1.3 it drops from 96.5% at 1 bar g to 69.4% at 12 bar g. The table assumes atmospheric pressure of 1.013 bar a.
| Discharge pressure (bar g) | Pressure ratio | Clearance volumetric efficiency |
|---|---|---|
| 1 | 1.99 | 96.5% |
| 3 | 3.96 | 90.6% |
| 5 | 5.94 | 85.3% |
| 7 | 7.91 | 80.5% |
| 8 | 8.90 | 78.1% |
| 10 | 10.87 | 73.7% |
| 12 | 12.85 | 69.4% |
This is why two-stage machines suit higher pressures. Splitting the compression lowers the first-stage pressure ratio, so the trapped air re-expands less and the first stage keeps a higher volumetric efficiency.
Worked example 1: checking a small two-cylinder compressor
A small two-cylinder, single-stage, single-acting compressor with a 65 mm bore and 50 mm stroke, running at 1,000 rpm to 7 bar g (101.5 psig), delivers 66.3% of its displacement against 80.5% allowed by clearance. This is the calculator’s default case, with atmospheric pressure 1.013 bar a, clearance 5%, n = 1.3 and a measured FAD of 0.22 m³/min. Treat it as an owner’s or buyer’s check, for example before buying a used unit or when deciding whether to replace one.
- Piston area = π/4 × 0.065² = 0.003318 m².
- Swept volume per cylinder = 0.003318 × 0.050 = 0.0001659 m³ per revolution.
- Displacement = 0.0001659 × 2 cylinders × 1,000 rpm = 0.3318 m³/min, shown as 0.332 m³/min, which is 0.3318 × 35.3147 = 11.72 cfm.
- Pressure ratio = (7 + 1.013) ÷ 1.013 = 8.013 ÷ 1.013 = 7.91.
- Clearance volumetric efficiency: 7.91^(1/1.3) = 4.908; 1 − 0.05 × (4.908 − 1) = 1 − 0.05 × 3.908 = 0.8046, or 80.5%.
- Measured volumetric efficiency = 0.22 ÷ 0.3318 = 0.663, or 66.3%.
- Other losses = 80.5 − 66.3 = 14.2 percentage points.
- FAD if only clearance losses applied = 0.8046 × 0.3318 = 0.267 m³/min.
The machine loses 14.2 points beyond clearance, roughly 0.267 − 0.22 = 0.047 m³/min of air, which points to worn valves or rings or a slipping belt. For comparison, a unit of the same size with sound valves and rings that delivered 0.25 m³/min would show a measured volumetric efficiency of 0.25 ÷ 0.3318 = 75.3%, and other losses of 80.46 − 75.34 = 5.1 points. A pump-up test on the receiver confirms the real delivery before any decision to buy or replace is made.
Worked example 2: double-acting first stage of an industrial compressor
A double-acting single-cylinder first stage with a 150 mm bore, 100 mm stroke and 40 mm rod, running at 740 rpm to 2.5 bar g, has a displacement of 2.52 m³/min and a measured volumetric efficiency of 79.3%. Clearance is 8%, n = 1.3, atmospheric pressure 1.013 bar a and measured FAD 2.0 m³/min.
- Head-end swept volume = π/4 × 0.150² × 0.100 = 0.0017671 m³ per revolution.
- Crank-end swept volume = π/4 × (0.150² − 0.040²) × 0.100 = π/4 × 0.0209 × 0.100 = 0.0016415 m³ per revolution.
- Total swept volume = 0.0017671 + 0.0016415 = 0.0034086 m³ per revolution.
- Displacement = 0.0034086 × 1 cylinder × 740 rpm = 2.5224 m³/min, shown as 2.52 m³/min, which is 2.5224 × 35.3147 = 89.08 cfm.
- Pressure ratio = (2.5 + 1.013) ÷ 1.013 = 3.513 ÷ 1.013 = 3.468, shown as 3.47.
- Clearance volumetric efficiency: 3.468^(1/1.3) = 2.603; 1 − 0.08 × 1.603 = 1 − 0.128 = 0.872, or 87.2%.
- Measured volumetric efficiency = 2.0 ÷ 2.5224 = 0.793, or 79.3%.
- Other losses = 87.2 − 79.3 = 7.9 percentage points.
- FAD if only clearance losses applied = 0.872 × 2.5224 = 2.2 m³/min.
Despite its larger 8% clearance, this stage keeps a high clearance efficiency because its pressure ratio is only 3.47. Other losses of 7.9 points are moderate, about 2.2 − 2.0 = 0.2 m³/min of air, and a trend of this figure over successive checks shows when valves or rings need attention.
Indian site conditions that change the answer
Altitude, hot intake air and dust all change volumetric efficiency on Telangana and Andhra Pradesh sites. Hyderabad lies about 500–550 m above sea level, where barometric pressure is about 0.95 bar a. With the same 7 bar g discharge, the pressure ratio rises to (7 + 0.95) ÷ 0.95 = 8.37, and at 5% clearance and n = 1.3 the clearance efficiency falls from 80.5% to about 79.4%. Enter the local atmospheric pressure, not 1.013 bar a.
- Summer intake air of 40–45 °C and hot compressor rooms: hot intake air is less dense, so each cubic metre of FAD carries less mass, and hotter cylinders and valves add suction heating, so measured efficiency usually falls in summer. Compare tests at similar intake temperatures.
- Monsoon humidity: water vapour takes up part of each intake stroke, more condensate forms after compression, and wet valves foul faster.
- Dusty sites: dust that passes a poor intake filter scores rings and cylinders and lodges under valve plates, raising leakage. A choked filter adds suction pressure loss.
- Power cuts: frequent restarts, especially if the unloader does not release trapped pressure, strain belts and valves; check belt tension and slip afterwards.
How to interpret the result, and its limits
The result is a screening figure: it shows how far a compressor falls short of its design potential, but not which component is at fault. The clearance equation is idealised; real clearance is rarely published and n varies with cylinder cooling, so the clearance figure is an estimate.
The measured figure is only as good as the FAD measurement: an estimated receiver volume or a coarse gauge shifts the answer. Measure the actual speed, because belt slip is otherwise counted as an internal loss. Second-stage problems show mainly as abnormal interstage pressure rather than in this figure. Use it to compare the same machine over time, not as a pass or fail.
How to check a piston compressor’s output step by step
A piston compressor’s output is checked by measuring its geometry, real speed and free air delivery under steady conditions, then comparing the measured and clearance efficiencies.
- Record bore, stroke, number of first-stage cylinders, single- or double-acting construction and rod diameter.
- Measure the actual crankshaft speed under load, and check belt tension and wear.
- Note the local atmospheric pressure and the intake air temperature at the time of the test.
- Measure FAD with a pump-up test on a receiver of known volume, or a calibrated flow measurement at the working pressure.
- Enter the first-stage discharge pressure, clearance (use the calculator’s default of 5% if unknown and note the assumption) and n = 1.3.
- Compare measured and clearance volumetric efficiency, and read the other-losses figure.
- If measured efficiency is below 50% or other losses are high, inspect valves, rings, intake filter and belts.
- Record the result and repeat the test after any change.
How Reddy Compressors helps
Reddy Compressors, based at Tarnaka, Secunderabad, and operating since 2002, is an independent multi-brand compressor specialist supplying new and used/refurbished compressors, spare parts, service and rentals; service covers all major brands across Telangana and Andhra Pradesh, and equipment is supplied across India. For larger industrial piston compressors, outside the small 2–10 hp range, we can review your test figures and assess whether output can be restored. Small 2–10 hp compressors are offered for sale and hire only, with the air receiver included on hire, and are not serviced. Rental machines from 50 to 2,000 cfm at 2 to 30 bar, and special high-pressure DTH/borewell units up to 35 bar, can cover a shortfall while a decision is made.
What to send us
To review the output of a larger industrial piston compressor, send us the following details.
- Number of stages and nameplate data, including rated speed and pressure.
- Bore, stroke, number of first-stage cylinders, and rod diameter if double-acting.
- Measured speed under load and the working discharge pressure.
- Your FAD or pump-up test readings, with receiver volume and fill times.
- Intake air temperature, site location and compressor room conditions.
- Your plant’s air demand and daily running hours.
Watch
Short explainers on this topic
Slide-by-slide engineering explainers from Reddy Compressors. More in the video library.
Frequently asked questions
What is a good volumetric efficiency for a reciprocating compressor?
A good volumetric efficiency is one close to the clearance figure for the same pressure ratio, with only a few points of other losses. The clearance figure sets the ceiling: at 5% clearance, n = 1.3 and 1.013 bar a it is 80.5% for a single stage at 7 bar g and 90.6% at 3 bar g. On this page, gaps of 5.1 and 7.9 points are consistent with a machine in reasonable condition, while a 14.2-point gap is worth investigating. A measured figure below 50% often points to worn valves, worn rings or a slipping belt.
How do I calculate piston displacement of an air compressor?
Piston displacement is bore area multiplied by stroke, number of first-stage cylinders and speed. For a single-acting cylinder the swept volume is π/4 × D² × L; a double-acting cylinder adds π/4 × (D² − d²) × L for the crank end, where d is the rod diameter. A 65 mm bore, 50 mm stroke, two-cylinder machine at 1,000 rpm gives 0.0001659 m³ × 2 × 1,000 = 0.332 m³/min, or 11.72 cfm. Multiply m³/min by 35.3147 to obtain cfm.
What value of the re-expansion exponent n should I use?
Use n = 1.3, the calculator’s default, unless better data is available. For air, n lies between 1.0 (isothermal re-expansion) and 1.4 (isentropic re-expansion). The lower n is, the more of the stroke the trapped clearance air fills as it re-expands to suction pressure, so the lower the clearance efficiency. At 7 bar g, 1.013 bar a and 5% clearance, the clearance figure is 65.4% with n = 1.0, 80.5% with n = 1.3 and 83.1% with n = 1.4. Use the same n each time you test a machine so that results stay comparable.
How does clearance volume affect compressor output?
Clearance volume reduces output because compressed air left in it re-expands on the suction stroke and takes up part of the swept volume. The effect grows with both clearance and pressure ratio, following VE = 1 − c × (r^(1/n) − 1). At 5% clearance, n = 1.3 and 1.013 bar a, clearance efficiency is 96.5% at 1 bar g but 69.4% at 12 bar g. If clearance becomes large enough to make the figure zero or below, the stage delivers no air at all.
Why are two-stage compressors used for higher pressures?
Two-stage compressors are used for higher pressures because dividing the compression lowers the pressure ratio in each stage, which keeps volumetric efficiency higher and, with intercooling, discharge temperature lower. The first stage draws in all the free air, so its ratio governs delivery. At 5% clearance and n = 1.3, a single stage working at a ratio of 12.85 keeps only 69.4% clearance efficiency, while a stage working at a ratio of 3.96 keeps 90.6%. The second stage then completes the compression from the interstage pressure.
Can I check a used compressor’s output before buying it?
Yes, a used compressor’s output can be checked before buying by comparing its measured FAD with its displacement. Record bore, stroke, cylinders and speed, calculate displacement, then run a pump-up test on a receiver of known volume to measure real delivery. For a small two-cylinder unit with 0.332 m³/min displacement at 7 bar g, a FAD of 0.22 m³/min gives only 66.3% against a clearance ceiling of 80.5%, suggesting worn valves or rings and a lower fair price.
Related pages
- Compressed air knowledge and calculation centre
- Compressor pump-up test and capacity check
- Reciprocating compressor valve engineering
- Reciprocating pistons, rings and cylinder condition
- Two-stage reciprocating compressors
- FAD and reference condition conversion tool
- Multi-stage compression and intercooler calculator
- Screw compressor service in Hyderabad
- Air compressor on rent in Hyderabad
Technical content reviewed by D. Srinivas Reddy, Managing Partner and service engineer, Reddy Compressors. Last updated 10 November 2026. How our engineering content is reviewed.
Calculators and worked examples
These tools give indicative figures for screening, comparison and for preparing an enquiry. They run in your browser and send nothing. No prices or tariffs are assumed: enter your own to see costs. Efficiencies and other figures shown are example values: replace them with your own. Results are not a performance guarantee or a design certificate; final selection is confirmed by a service engineer against the machine data sheet and the site.
Piston displacement and volumetric efficiency
The worked example below shows the method with fixed numbers. Turn on JavaScript to change the inputs.
Worked example
Inputs
- Cylinder bore (mm): 65
- Piston stroke (mm): 50
- Number of first-stage cylinders: 2
- Cylinder action: Single-acting
- Piston rod diameter (mm, double-acting only): 0
- Compressor speed (rpm): 1,000
- Measured free air delivery (m³/min): 0.22
- Atmospheric pressure (bar a): 1.013
- First-stage discharge pressure (bar g): 7
- Clearance volume (% of swept volume): 5
- Re-expansion exponent n: 1.3
Result
- Piston displacement: 0.332 m³/min
- 11.72 cfm
- Stage pressure ratio (absolute): 7.91
- Measured volumetric efficiency: 66.3%
- Clearance volumetric efficiency (theoretical): 80.5%
- Other losses: heating, valves, leakage: 14.2 percentage points
- Free air delivery if only clearance losses applied: 0.267 m³/min
Method. Displacement = π/4 × D² × L × cylinders × rpm (double-acting adds π/4 × (D² − d²) × L). Clearance volumetric efficiency = 1 − c × (r^(1/n) − 1), with r the absolute stage pressure ratio. Measured volumetric efficiency = measured free air delivery ÷ displacement; the gap between the two is heating, valve and leakage loss.
What to take from it. This small two-cylinder unit delivers 66% of its displacement against a clearance figure of about 80%. The 14-point gap is worth a pump-up test and a look at the valves and rings before trusting its rating.