All brands, all models · Sales · Rentals · Service & AMC · Spare parts · Used & refurbished+91 99590 60718WhatsAppEmailSecunderabad / Hyderabad
REDDY COMPRESSORS

About

Why choose Reddy Compressors

8 min read12 sections

Who we are

Reddy Compressors works from Srinilayam, 12-13-200, First Floor, Street No. 1, Tarnaka, Secunderabad 500017. We sell, rent and service compressors from ELGi, Atlas Copco, Ingersoll Rand, KAESER, Chicago Pneumatic, Doosan, Sullair, Kirloskar, Gardner Denver and other makers. We are not an authorised dealer or distributor of any of these brands; their names and trademarks belong to their owners. We have tie-ups with all major and reputed brands. Being independent lets us recommend the technology and brand that fit the job.

Reddy Compressors and Reddy Generators are under the same management, so temporary air and temporary power can be planned as one package where a site needs both.

We start with the air requirement, not the catalogue

A compressor bought by horsepower or by the largest cfm figure on a brochure often disappoints. The same nominal capacity behaves very differently on a borewell rig, a pharma plant and a fabrication shop. So our first questions are about the work:

On-time delivery, expert service, quality spares identified from your machine
Why choose Reddy Compressors. Illustrative graphic.
  • What must the air do at the point of use, and what pressure does that tool or process need?
  • How much free air is used, and how does demand change through the shift?
  • What air quality is needed, for example the ISO 8573-1 class for oil, water and particles?
  • Is the duty continuous, intermittent, seasonal or a one-off project?
  • What are the site conditions: power, ambient temperature, dust, space and access?

Only after that do we talk about compressor type, size, dryer and filters. Every extra bar of pressure costs roughly 7% more power on a typical screw compressor, so choosing the right pressure alone can matter more than choosing the brand.

Sales, rental, service and spares from one team

What we doWhat it covers
New compressor salesRotary screw, reciprocating, oil-free, portable diesel and electric, high-pressure, booster and tractor-mounted compressors; brand-new machines supplied to site for long-term projects
Used and refurbishedInspected and serviced used machines where budget or lead time makes new equipment unsuitable
RentalOwn fleet from 50–2,000 cfm and 2–30 bar (29–435.1 psig), diesel and electric, oil-injected and oil-free, with hoses, operators and servicing on hire
Service & AMCPreventive maintenance, annual maintenance contracts, breakdown repair and overhaul on machines above 10 hp (small 2–10 hp units are for sale and hire only), by over 20 service engineers and technicians
Spare partsFilters, separators, oils, valves, sensors, airend and engine parts, identified from the machine and confirmed before quoting
Air auditsLeak, pressure, demand and specific-power measurement, using the ISO 11011 method as our framework

We also sell, rent and service blowers (Roots, screw, centrifugal and side-channel), vacuum pumps, gas compressors (CNG, nitrogen, process gas and booster) and centrifugal compressors, and we provide service and spares for axial compressors.

Buy, rent or both

Not every requirement should end in a purchase. A shutdown, a commissioning period, a breakdown or a short contract is often better served by hire. A plant with steady base demand and occasional peaks may own the base and rent the peak. A contractor with a multi-year project may want a new machine supplied to site with our service behind it. We set out the options honestly, including when buying a used machine makes more sense than either.

On hire jobs we service machines every 300 running hours, with oil change and inspection, and we can supply operators for round-the-clock work.

Matching the technology to the work

Because we are not tied to one maker or one technology, the recommendation follows the duty:

Typical needTechnology we usually consider
Factory plant air, continuous dutyOil-injected rotary screw, often with variable speed for changing demand, plus a refrigerated dryer (typical pressure dew point about +3 °C)
Pharma, food, electronics and textile process airOil-free screw or scroll compressors, with dryers and filtration to the specified ISO 8573-1 class
Workshops and intermittent small demandReciprocating (piston) compressors
Construction, breakers and rock drillsPortable diesel compressors, typically 185–600 cfm at 7–10 bar (101.5–145 psig)
Borewell and DTH drillingHigh-pressure portable compressors, 600–1,500 cfm at 200–400 psig (13.8–27.6 bar), special units up to 35 bar (507.6 psig)
Rural and farm workTractor-mounted PTO-driven piston compressors
Low-pressure bulk air and aerationRoots, screw, side-channel or centrifugal blowers

What a service visit involves

A planned service starts with the machine’s history: running hours, load and unload hours, alarms and the last service record. Our service engineer checks discharge temperature (typically about 75–95 °C on an oil-injected screw), pressures, oil condition, cooler cleanliness, drains, belts or couplings, and the dryer’s dew point where one is fitted. Filters, separators and oil are changed to the maker’s interval or on condition, and anything worn is reported with a photo and a part identification before it is replaced. The customer receives a written service report, which builds the evidence for planning the next overhaul rather than waiting for a breakdown.

For spare parts, we identify the item from the make, model, serial number, a nameplate photo or the old part itself, and confirm fit before quoting. This avoids the most common and expensive mistake in compressor maintenance: a part that looks right but does not fit or does not perform.

Projects we have delivered

Our team, across Reddy Compressors and Reddy Generators, has supplied temporary air and power for demanding work. Examples include a temporary power-and-air package at Kakinada for an international oilfield-services contractor on a major natural-gas development, with six compressors from 750 cfm at 150 psig to 1,100 cfm at 300 psig and generators up to 200 kVA; a 450 cfm diesel compressor on round-the-clock hire with operators on 12-hour shifts for a coating contractor at a steel plant in Andhra Pradesh; and two 450 cfm, 150 psig and one 400 cfm, 100 psig diesel compressors on hire for a power-plant project. We do not name customers without their consent. See the project records for more.

Where we work

Our office is in Tarnaka, Secunderabad. Our service teams cover the whole of Telangana and Andhra Pradesh, including the industrial belts around Hyderabad, Medak and Sangareddy, Visakhapatnam, Kakinada, Vijayawada, Nellore, Kurnool and Anantapur. Compressors, rentals and spare parts are supplied across India, and we provide project-based site support wherever it is feasible. We do not have branch offices elsewhere.

Local conditions shape our advice. Summer ambient temperatures of 40–45 °C, above 45 °C on open sites, and dust on construction and quarry sites push compressors towards high-temperature shutdowns, so we look closely at ventilation, cooler cleaning and filtration on every visit.

Thinking about the whole system

A compressor is only one part of a compressed-air system. Pressure drop through undersized pipework, a blocked filter or a dryer that has lost its dew point can make a good compressor look bad. Leaks waste air around the clock. Receivers that are too small make machines cycle hard. When we are asked to fix a pressure problem, we look along the whole path from inlet filter to point of use before suggesting a bigger machine.

How we keep advice honest

  • We do not claim to be an authorised dealer, and we say so on brand pages.
  • We identify spare parts from the make, model, serial number, nameplate photo or the old part, and confirm fit before quoting.
  • We use typical engineering figures as typical, not as guarantees, and we ask for measurements before promising savings.
  • We describe our projects factually and anonymously, without inventing outcomes.
  • When a duty is outside what we can support, we tell you.

How Reddy Compressors helps

Whether you need a new screw compressor for a factory, a diesel portable for a borewell rig or a blasting job, a used machine to cover a gap, an AMC for a mixed fleet or a rental package for a shutdown, one team handles the duty definition, supply, commissioning, service and spares. Because we work with many brands, we can look after an entire plant room that contains machines from different makers, and give one point of contact for all of them.

Call +91 99590 60718 or +91 92468 88812, WhatsApp +91 99590 60718, or email info@reddycompressors.com or reddycompressors@gmail.com.

What to send us

  • What the air is used for, and the pressure needed at the tool or process
  • Approximate air demand in cfm or m³/min, and operating hours
  • Whether you want to buy new, buy used, rent or service
  • Site location and power available (electric supply or diesel)
  • For an existing machine: make, model, serial number and nameplate photo

Frequently asked questions

Is Reddy Compressors an authorised dealer for any brand?

No. We are an independent multi-brand business. We sell, rent and service compressors from ELGi, Atlas Copco, Ingersoll Rand, KAESER, Chicago Pneumatic and many other makers, but we are not an authorised dealer or distributor of any of them. That independence lets us recommend the technology and brand that suit your duty, and look after mixed fleets from a single team.

Which areas does Reddy Compressors serve?

Our office is at Tarnaka, Secunderabad. Our service engineers cover all of Telangana and Andhra Pradesh, not only Hyderabad and Secunderabad. New and used compressors, rental machines and spare parts are supplied across India, and project-based site support is provided wherever it is practical. We do not operate branch offices outside Secunderabad.

Do you rent compressors or only sell them?

Both. We rent from our own fleet, from 50–2,000 cfm and 2–30 bar, diesel and electric, oil-injected and oil-free. Rental can include hoses, operators, and servicing every 300 running hours. We also sell new and used machines, and supply brand-new compressors to site for long-term projects where buying is not the right answer for the customer.

Can you service a compressor you did not supply?

Yes. Most of our service work is on machines supplied by others. Send the make, model, serial number, running hours and a nameplate photo, along with the fault or service due. Our engineers handle preventive maintenance, AMCs, breakdowns and overhauls across Telangana and Andhra Pradesh, and we identify spare parts from the machine before quoting.

How long has Reddy Compressors been in business?

We have served industry since 2002, and we are managed together with Reddy Generators. Over that time our team has supplied compressors and temporary air and power packages for oil and gas, steel, power, irrigation, metro and other projects, along with routine sales, rental and service work for factories and contractors.

Why should I define my air requirement before buying a compressor?

Because the pressure, flow pattern, air quality and duty cycle decide which compressor will work well and how much it will cost to run. Buying by horsepower or headline cfm often leads to the wrong pressure, an oversized machine running unloaded, or poor air quality. Defining the requirement first usually gives a smaller, cheaper-to-run and more reliable system.

Technical content reviewed by D. Srinivas Reddy, Managing Partner and service engineer, Reddy Compressors. Last updated 7 November 2026. How our engineering content is reviewed.

Talk to Reddy Compressors

Tell us the job. We will send the right answer.

Buying, hiring, servicing or looking for a part: share what the air must run, the pressure and the site. A nameplate photo is often enough to start.

+91 99590 60718+91 92468 88812