All brands, all models · Sales · Rentals · Service & AMC · Spare parts · Used & refurbished+91 99590 60718WhatsAppEmailSecunderabad / Hyderabad
REDDY COMPRESSORS

About

Our vision and mission

8 min read12 sections

Why compressed air must be treated as a system

Compressed air is invisible, but its effect on a plant is not. Too little pressure slows tools and stops processes. Too much wastes energy every hour. Poor treatment lets water and oil reach products and instruments. A wrongly sized compressor runs unloaded or struggles at peaks. Undersized pipework can make a good compressor look inadequate, and weak maintenance turns a reliable installation into a production risk.

These are not separate subjects. They are parts of one operating system: generation, treatment, storage, distribution, control and use. Since 2002, our work at Reddy Compressors has taught us that most compressed-air problems are solved by looking at the whole chain, not by replacing the most visible machine.

Our vision

We want customers to call us not only when they need to buy or hire another compressor, but when they need a clear answer to an engineering question:

  • What equipment suits this duty, and why?
  • What air quality does the process actually need?
  • Where is pressure being lost between the compressor and the user?
  • How should temporary capacity be arranged for a shutdown or project?
  • Should this machine be serviced, repaired, overhauled or replaced?

To earn that trust, we are building a business that combines equipment knowledge across brands and technologies, application engineering that links flow, pressure and duty to the real work, system thinking beyond the compressor, lifecycle support from selection to replacement, disciplined rental engineering, and practical engineering education through the knowledge pages on this site.

From product lists to engineering decisions

A typical equipment website begins with products: 10 hp, 100 cfm, 500 cfm, 7 bar, 10 bar, diesel, electric. Those specifications matter, but they are not the requirement. A useful decision moves through a sequence:

  1. Application: what the air must do.
  2. Air demand: how much flow, and how it varies.
  3. Pressure: what the user needs at the point of use, in bar and psig.
  4. Air quality: the ISO 8573-1 class the process requires.
  5. Duty and site conditions: hours, ambient heat, dust, altitude, power supply.
  6. Technology: oil-injected or oil-free, screw or piston, electric or diesel.
  7. Treatment, storage, distribution and controls.
  8. Equipment selection and the support that keeps it running.

Our aim is to move the conversation from “horsepower, cfm, price” towards “application, flow, pressure, duty, air quality, system, equipment, lifecycle”. The equipment information stays; it simply gains the context that makes it useful.

Our mission in six commitments

CommitmentWhat it means in practice
Start with the applicationWe ask what consumes the air, how much, at what pressure, how often and at what quality before we recommend a machine.
Protect uptimeWe design standby, plan maintenance and respond to breakdowns with the consequence of lost air in mind.
Stay brand-neutralWe sell, rent and service ELGi, Atlas Copco, Ingersoll Rand, KAESER, Chicago Pneumatic and others, and recommend what fits.
Engineer temporary air properlyRental machines are sized, treated, hosed and serviced with the same care as permanent plant.
Use evidence, not assumptionsWe measure pressure, flow, power and dew point where decisions depend on them.
Explain honestlyWe say what we know, what we have checked and what we have not, and we do not make claims we cannot support.

Start with the application

The machine should follow the requirement. A borewell rig needs high pressure and large flow to clean the hole; a pharmaceutical line needs dry, oil-free air at modest pressure; a construction site needs a robust portable that tolerates heat and dust. Before we select technology, we ask:

  • What tools, machines or processes use the air?
  • What flow and pressure does each one need?
  • Is demand steady, cyclic or occasional?
  • What air quality is required, and what happens if it is not met?
  • What are the ambient conditions and power supply?
  • What is the cost to the business if air stops?

Protect uptime

Customers do not buy compressors to own machinery. A manufacturing compressor supports production, a drilling compressor supports penetration and hole cleaning, and a rental machine supports a project schedule. Our job is to keep that work going. That means correct selection, preventive maintenance matched to real operating conditions, sensible standby arrangements, fast access to the right spares, and clear diagnosis when something fails. On our long hire jobs, for example, machines are serviced every 300 running hours, with oil changes and checks planned around the customer’s shifts.

Stay independent and multi-brand

We are an independent multi-brand specialist, not an authorised dealer of any manufacturer. We have tie-ups with all major and reputed brands. That independence is deliberate. Most plants run mixed fleets, and the right answer for a given duty may come from any of several manufacturers, or from a good used machine. Being brand-neutral lets us recommend the technology that fits, service the fleet the customer already has, and identify genuine or quality aftermarket parts from the nameplate.

Engineer temporary air with the same discipline

Rental is a core part of our business. Our own fleet covers 50 to 2,000 cfm and 2 to 30 bar (29–435.1 psig), diesel and electric, and for long-term projects we can supply brand-new machines to site. We treat a rental installation as engineering: the right capacity, hoses and fittings, aftercoolers or dryers where air quality matters, fuel and service planning, and operators where required. With Reddy Generators, under the same management, we can supply complete temporary power-and-air packages, as we did for a natural-gas development project at Kakinada.

Serve customers across Telangana, Andhra Pradesh and India

We are often described as a Hyderabad business, but our work reaches much further. Our service teams cover the whole of Telangana and Andhra Pradesh: industrial estates around Hyderabad and Secunderabad, pharmaceutical units in Genome Valley and beyond, construction and infrastructure sites, quarries, borewell drilling across both states, and power, steel and process plants. Compressors, rental machines and spare parts are supplied across India.

Our project record reflects that reach. Our team has supplied 450 cfm diesel compressors on round-the-clock hire to a steel plant in Andhra Pradesh, 450 cfm and 400 cfm machines for a power-plant project, a 400 cfm unit with a 25 kVA generator for a project at Raichur in Karnataka, and three 450 cfm compressors for a lift irrigation project. Each was supported with servicing planned around the job.

Indian conditions shape how we engineer. Summer ambient temperatures of 40–45 °C, and above 45 °C on open sites, dust on construction and mining sites, and unstable power on remote sites all affect compressor selection, cooling, filtration and maintenance. We build those realities into our recommendations rather than relying on catalogue conditions.

Support the machine through its whole life

A compressor’s life does not end at commissioning. Our mission covers each stage: selection and supply, installation advice, preventive maintenance and AMC, breakdown repair, overhaul, parts supply and, eventually, a fair decision on repair or replacement. Where a good used or refurbished machine is the sensible answer, we offer it; where a new machine is justified, we supply it; where the need is temporary, we rent.

Use evidence and explain honestly

Good decisions need facts. Where the answer depends on real demand, pressure losses, leakage or specific power, we measure rather than guess. When we report, we separate what was measured from what was estimated, and we do not promise savings before the data shows them. On this site we publish engineering knowledge that helps customers make their own decisions, whether or not they buy from us.

How Reddy Compressors helps

From our office at Srinilayam, Tarnaka, Secunderabad, more than 20 service engineers and technicians support customers across Telangana and Andhra Pradesh, and we supply compressors, rentals and spare parts across India.

  • New and used compressor sales across major brands.
  • Rental compressors from our own fleet, short and long term.
  • Service, AMC, breakdown repair and overhaul.
  • Spare parts identified from the machine before quoting.
  • Compressed-air audits and system advice.

What to send us

  • What the air is used for, and where.
  • Required flow in cfm or m³/min and pressure in bar or psig.
  • Details of any existing compressors: make, model, nameplate photo.
  • Whether you need purchase, rental, service or parts.
  • Your timeline and site location.

Frequently asked questions

What does Reddy Compressors do?

Reddy Compressors is an independent multi-brand compressed-air specialist based at Tarnaka, Secunderabad, working since 2002. We sell new and used compressors, rent machines from our own fleet, provide service, AMC, breakdown repair and overhaul, carry out air audits, and supply spare parts. Our service teams cover Telangana and Andhra Pradesh, and we supply equipment and parts across India.

Why start with the application instead of the compressor size?

Because size alone does not describe the job. Two users needing the same cfm may need very different pressures, air quality, duty cycles and standby arrangements. Starting with the application lets us choose the right technology, treatment and controls, avoid oversizing, and make sure the compressor actually does the work it was bought for.

Do you only work with one compressor brand?

No. We sell, rent and service ELGi, Atlas Copco, Ingersoll Rand, KAESER, Chicago Pneumatic, Doosan and other brands. We are not an authorised dealer of any manufacturer, which allows us to recommend the machine that suits your duty and to support the mixed fleet you already run, with genuine or quality aftermarket parts.

Can you supply compressors for projects outside Hyderabad?

Yes. Our service teams cover the whole of Telangana and Andhra Pradesh, not only Hyderabad and Secunderabad. Compressors, rental machines and spare parts are supplied across India, and project-based site support can be arranged elsewhere where feasible. Tell us the location, duty and duration, and we will confirm what we can provide.

Reddy Compressors and Reddy Generators are under the same management. Reddy Generators supplies and services diesel generator sets. Together, our teams can supply temporary power and compressed air for projects, shutdowns and remote sites, with generators, compressors, distribution and site support arranged as one package where the job needs it.

What do you check before recommending a compressor?

We check what the air is used for, the flow and pressure each user needs, how demand varies, the air quality required, operating hours, ambient conditions and power supply, and the cost of an air failure. Where an existing system is involved, we also look at leaks, pressure losses and controls, because fixing those can change the size of machine needed.

Technical content reviewed by D. Srinivas Reddy, Managing Partner and service engineer, Reddy Compressors. Last updated 17 October 2026. How our engineering content is reviewed.

Talk to Reddy Compressors

Tell us the job. We will send the right answer.

Buying, hiring, servicing or looking for a part: share what the air must run, the pressure and the site. A nameplate photo is often enough to start.

+91 99590 60718+91 92468 88812