Buying a screw compressor is really buying a utility: delivered airflow at a defined pressure, an acceptable air quality, a known energy cost over the load profile and an arrangement that keeps production running when one machine is down. The sections below follow the complete installation from the compression process to the point of use. They cover technology choices, package components, sizing, pressure budgets, storage, dryers, installation, commissioning, maintenance, troubleshooting and lifecycle cost. The page is written for equipment buyers, plant engineers and maintenance teams weighing new, replacement, refurbished or rental equipment. The calculations are illustrative and must be reconciled with the selected package and site.
How rotary screw compression works
Two intermeshing helical rotors, a male and a female, trap air in the spaces formed between the rotor lobes and the housing. As the rotors turn, those pockets move towards the discharge end and shrink in volume, so pressure rises until the air leaves through the discharge port. Because many pockets are in progress at once, delivery is relatively smooth compared with the pulsating discharge of a reciprocating machine.
The airend provides the compression mechanism, but the package decides how that mechanism behaves in a factory. Intake control, lubrication, separation, cooling, electrical equipment and protective logic all affect delivered output and reliability. Two packages with similar motor ratings can have different FAD, electrical input and part-load behaviour.
Compression raises temperature. An idealised polytropic relationship, P × Vⁿ = constant, describes the compression path in principle, but real package performance involves internal leakage, injected-oil cooling, pressure losses and mechanical efficiencies. In a healthy oil-injected machine the discharge temperature is typically about 75–95 °C. Use measured or verified package data for comparisons rather than trying to predict electrical input from a simplified gas law.
Oil-injected and oil-free screw designs
In an oil-injected design, lubricant enters the compression space to remove heat, seal the clearances between rotors and lubricate the bearings. The air–oil mixture then passes through bulk separation in the separator vessel and a separator element. The oil circuit includes filtration, cooling and a thermostatic valve before the oil returns to the airend.
Separation removes lubricant within the package’s design capability; it does not justify a claim that the downstream air contains no oil. Separator condition, scavenge-line function, lubricant choice and operating temperature all affect carry-over. Oil aerosols and oil vapour need different treatment (coalescing filters for aerosols, activated-carbon adsorption for vapour) when tighter purity is needed.
Oil-free screw designs avoid any intentional oil injection into the compression chamber. Many dry-running designs use timing gears and staged compression with intercooling. Other oil-free arrangements exist; confirm the specific package construction. Bearings and gears still need lubrication in separate, sealed circuits. A declared air-quality class, such as ISO 8573-1 Class 0 for oil, must be read together with its test conditions and system boundary.
Oil-free air can still contain atmospheric water vapour, particles and ambient hydrocarbons drawn in through the intake. Product-contact applications need a risk-based specification for the whole system, including treatment, distribution and verification. A technology label does not replace an air-quality acceptance criterion.
| Aspect | Oil-injected screw | Oil-free screw |
|---|---|---|
| Cooling and sealing | Injected oil | Clearances, staging and intercooling |
| Typical stages | Usually one | Usually two |
| Downstream oil | Low but present; filtration needed for sensitive uses | No oil added by compression; intake contamination still possible |
| Purchase cost | Lower | Higher |
| Typical uses | General industry, workshops, construction | Pharma, food, electronics, textiles, instrument air |
| Condensate | Potentially oil-contaminated; collect and treat against applicable discharge criteria | Oil-free from compression, still handled to site rules |
Fixed-speed or variable-speed control?
A fixed-speed compressor produces its rated flow when loaded. When demand falls, a load/unload controller closes the inlet valve and blows down the separator while the motor keeps running. Unloaded power, often a substantial fraction of loaded power, is therefore a real part of annual consumption. Many packages stop after a set unloaded period, within their permitted starts per hour.
A variable-speed drive (VSD) adjusts motor speed within a defined range so delivery follows demand more closely and some part-load losses disappear. Efficiency still varies across the speed range, and the minimum speed sets a lower delivery limit. Below that point the unit unloads, stops or cycles according to its design.
A steady base demand often suits a fixed-speed machine running near full load. A varying trim demand often suits a VSD. In a multi-compressor house the combination matters: poorly coordinated pressure bands can leave several machines unloading while one tries to regulate.
| Demand pattern | Candidate arrangement | Evidence to review |
|---|---|---|
| Stable sustained demand | Correctly sized fixed-speed package | Full-load input and useful delivery |
| Significant variation within a workable range | Variable-speed package | Part-load curve and minimum flow |
| Large base load with variable peaks | Base and trim arrangement | Combined operating-state model |
| Very low, intermittent use | Smaller screw or a piston alternative | Starting, unloading and duty economics |
| Critical continuous production | Duty and standby provision | Capacity after an outage and restart logic |
Compare control options using a measured demand profile. A generic percentage saving quoted for VSD cannot establish the saving at a particular plant.
Single-stage and two-stage packages
A single-stage package achieves the full pressure rise in one airend. A two-stage package divides the rise between two airends, often with cooling between them. Dividing the compression can reduce power for certain duties and higher pressures, but the real benefit depends on design, operating pressure and package losses.
Check the complete package rather than assuming every two-stage machine beats every single-stage machine. Compare FAD, total input power, maintenance scope and part-load efficiency at the same pressure, and consider the availability and cost of specialised spares.
Stage configuration and pressure class are separate questions. Do not buy a higher-pressure package because it looks more elaborate. The useful criterion is efficient delivery at the pressure your consumers actually need.
Components that decide reliability
| Component | Function | Relevant deterioration or fault |
|---|---|---|
| Intake filter and inlet valve | Admit and control intake air | Restriction, contamination or incomplete opening |
| Airend and bearings | Perform compression | Wear, vibration or abnormal loading |
| Drive, coupling or belts | Transmit motor power | Misalignment, belt tension loss or coupling wear |
| Separator vessel and element | Separate oil from discharge air | High differential pressure or carry-over |
| Oil filter and oil cooler | Protect and cool the lubricant | Restriction, fouling or poor heat rejection |
| Thermostatic valve | Hold the intended oil temperature | Wrong regulation: condensation in oil, or overheating |
| Minimum-pressure valve | Keep internal pressure for oil circulation and separation | Incorrect opening or leakage |
| Aftercooler and moisture separator | Remove heat and liquid | Fouling, blocked drains or high outlet temperature |
| Sensors and controller | Regulate and protect | Drift, wrong settings or communication faults |
Component functions vary by manufacturer. A minimum-pressure valve is part of the package design and must never be removed to get a lower plant pressure. Protective temperature trips and relief valves must never be bypassed to keep production running.
A service quotation should identify the model, serial number, revision and part references. Separator elements, lubricants or control valves that look alike can have materially different characteristics, so compatibility must be established before installation.
Establish the demand profile before sizing
List every significant consumer with its operating pressure, free-air consumption, duty and timing. Separate productive use, unavoidable process losses, avoidable leakage and planned expansion. Logging flow, pressure and electrical power during representative production gives a far stronger basis than adding nameplate maxima.
Average demand sets most of the energy bill. Peak demand decides whether storage and distribution can prevent unacceptable pressure sag. Duration matters: a two-second burst can come from local storage, while a ten-minute production peak may need extra compressor capacity.
For an existing plant, include shift changes, breaks, weekends, product changes and seasonal conditions such as the hot pre-monsoon months. An idle-period flow reading often reveals leakage or equipment left enabled, but first account for legitimate users such as instrument air or overnight processes.
Add capacity allowances for stated reasons. If growth is expected, identify the extra machines and their pattern. An arbitrary large margin can worsen part-load operation for years before the planned demand arrives.
Build the pressure budget from the process
Start at the most demanding legitimate consumer and establish the minimum pressure it needs while working. Add the dynamic losses through its branch, the distribution, treatment and control band. Then check that the lowest compressor control pressure still satisfies that budget.
For example, if a process needs 6.0 bar g (about 87 psig) and the documented allowance for distribution, treatment and control variation is 0.8 bar (11.6 psi), the preliminary lower supply requirement is 6.8 bar g, 98.6 psig. That is not a standard discharge setting; real losses change with flow, filter condition and pipework.
Measure losses at the same moment and in the same operating state. Comparing a compressor gauge read while idle with a machine gauge read during a peak gives a misleading diagnosis. A regulator can only hold its downstream setting when it has enough inlet pressure and flow capacity; it cannot create pressure that is missing upstream.
Every extra bar of generation pressure costs roughly 7% more compressor power. A single high-pressure user can therefore force the whole plant to run inefficiently. Assess whether that user deserves a separate pressure system or an approved booster, with its own capacity, safety and lifecycle assessment.
Compare performance on a consistent basis
Many manufacturers publish performance data sheets in a standardised format, with delivered flow measured to ISO 1217 acceptance testing of displacement compressors. Check whether the particular model and reported values have actually been independently verified; a familiar sheet format alone is not evidence of verification.
Specific power is package electrical input divided by delivered flow. If package input is 75 kW and FAD is 12 m³/min at the stated pressure, specific power is 75 ÷ 12 = 6.25 kW per m³/min. A lower value means less electricity for the same delivered air at that condition, provided the measurement boundaries and reference conditions match.
- Motor rated output is not total package input; ask whether quoted power includes cooling fans and auxiliaries.
- Identify whether dryer electrical input and any regeneration air are included or accounted for separately.
- For VSD machines, compare several operating points weighted by the hours expected at each.
- For fixed-speed machines, request loaded, unloaded and stopped-state behaviour.
An attractive full-load figure can be outweighed by thousands of hours at poor part-load conditions.
Worked specific-power comparison
Package A takes 75 kW to deliver 12 m³/min (6.25 kW per m³/min); package B takes 72 kW to deliver 11 m³/min (about 6.55 kW per m³/min), both at the same pressure. If the plant needs 10 m³/min for 4,000 hours a year and both machines held those figures at that flow, A would use about 6.25 × 10 × 4,000 = 2,50,000 kWh and B about 6.55 × 10 × 4,000 = 2,62,000 kWh, a difference of roughly 12,000 kWh a year. The lower motor rating does not make B the cheaper machine to run. Real part-load behaviour differs from full-load specific power, so repeat the comparison with each package’s loaded, unloaded or VSD curve against your own demand profile.
Receivers and dynamic storage
Receivers buffer short demand changes and steady the compressor controls. Wet-side storage, before the dryer, helps cooling and liquid collection; dry-side storage supports treated-air peaks. The arrangement must respect dryer capacity, pressure control and the transient flow through treatment equipment.
Approximate usable free air equals receiver volume × usable pressure difference ÷ reference absolute pressure. A 1,000 L receiver working through a usable 1 bar (14.5 psi) band stores about 1,000 × 1 ÷ 1.013 = 987 free litres under near-isothermal assumptions.
If the net deficit during a peak is 2 m³/min (2,000 L/min), that theoretical reserve lasts about 987 ÷ 2,000 = 0.494 minutes, or 29.6 seconds. Use the deficit after subtracting concurrent compressor delivery. Rapid expansion, treatment losses and the lowest permissible process pressure reduce the useful margin.
Storage cannot cover a continuous shortfall, and a large central receiver does not guarantee that air can travel through a restricted branch fast enough. Local storage may help a short pulse application, but its connection, check valves, regulation and protection need deliberate design.
Drying, filtration and condensate
The required purity should state particles, water and oil at the relevant point of use. ISO 8573-1 gives the classification framework, and the right class follows the application and the equipment’s requirements. Avoid imposing one expensive purity level on every branch without assessing the risks.
| Treatment | Typical result | Selection check |
|---|---|---|
| Refrigerated dryer | Pressure dew point typically around +3 °C | Correction for inlet temperature, ambient and pressure |
| Desiccant dryer | Pressure dew point typically −20 °C or −40 °C | Regeneration energy and air use; pre- and after-filtration |
| Coalescing filter | Removes oil and water aerosols within its rating | Rated flow, differential pressure, element life |
| Activated-carbon filter | Removes oil vapour and odours | Needs dry, coalesced air upstream |
| Zero-loss or level-sensing drains | Remove condensate without wasting air | Maintenance access and alarm |
Select dryers against maximum actual flow, pressure, inlet temperature, ambient or cooling-water conditions and the required pressure dew point. Correction factors can materially reduce nominal dryer capacity in Indian summer ambients of 40–45 °C, and above 45 °C on open sites. Coalescing filters are not substitutes for a dryer. Over-filtration adds avoidable pressure loss; under-filtration can damage equipment or compromise the process.
Failed drains either waste air or pass liquid downstream. Check separator, receiver, filter and dryer drains as one system. Oil-contaminated condensate needs proper treatment before discharge; it is not safe to drain simply because it came from atmospheric moisture.
Installation and ventilation
Place the compressor where intake air is as clean and cool as practical and every service panel can open fully. Respect the maker’s clearances and stop hot discharge air recirculating into the intake. An acoustic canopy does not remove the need for cooling airflow.
A preliminary ventilation heat balance is airflow = rejected heat ÷ (air density × specific heat × allowable temperature rise). With an assumed 50 kW rejected into the room, density 1.2 kg/m³, specific heat 1.0 kJ/kg K and a 10 K rise, the airflow is 50 ÷ (1.2 × 1.0 × 10) = 4.17 m³/s. This is a screening figure only; use the maker’s heat-rejection and airflow data and check duct resistance, fan capability, local climate and room layout. In practice most of the motor input power ends up as heat in the room unless it is ducted out.
Provide a suitable foundation, vibration provisions, rated connections and independent pipe supports. Electrical design must address starting current or VSD requirements, protective coordination and earthing for the actual supply, which in many Indian industrial estates means checking for voltage dips and harmonics too.
Water-cooled packages need a defined cooling-water flow, temperature, pressure and chemistry. Poor water or low flow defeats an otherwise correct compressor, so record utility conditions at commissioning.
Commissioning and handover
Commissioning creates the baseline for every later fault-finding exercise. Record serial numbers, controller settings, lubricant identity, inlet conditions, supply voltage, operating pressure, discharge temperature, electrical input and relevant air-quality results, together with the test boundary and instrument details.
- Test loaded operation at the design pressure.
- Test low demand and confirm unload and stop behaviour.
- Test restart after a power interruption.
- Test standby changeover and sequencer coordination without conflicting pressure bands.
- Observe the critical consumer during a realistic peak and check treatment performance at the same time.
Handover should include an equipment schedule, operating instructions, a piping schematic, maintenance requirements, safety documentation and an agreed spare-parts list, with unresolved defects recorded explicitly. A machine that starts and reaches pressure has not automatically passed every system requirement.
Maintenance driven by condition and manufacturer limits
Routine observation should trend discharge temperature, pressure, alarms, loaded and unloaded hours, noise, vibration and drainage. The trend is usually more useful than any single reading. Compare against the maker’s limits and the commissioned baseline under similar conditions.
Scheduled servicing covers lubricant, inlet filters, oil filters, separator elements, belts, coolers and model-specific items at the specified time and running-hour limits. Severe dust, high ambient temperature or unusual duty may justify an approved shortening of the schedule. On our own hire fleet, for example, we change oil and service machines every 300 running hours because of the dusty site duty they see.
Oil analysis, vibration analysis, separator differential pressure and power-per-flow trends support condition-based decisions, but they do not automatically extend every interval. Investigate an adverse change before calling it normal ageing.
Before opening equipment, isolate electricity, lock out against restart and verify that every pressure pocket is depressurised. Hot components and trapped pressure can remain after the controller says “stopped”.
Troubleshooting without masking the cause
| Symptom | Evidence to collect | Likely investigation areas |
|---|---|---|
| High discharge temperature | Ambient, inlet and discharge trends | Cooler fouling, airflow, oil level or grade, thermostatic valve, cooling water |
| Low plant pressure | Simultaneous compressor and consumer pressure | Demand, leaks, restrictions and control state |
| Excessive oil carry-over | Oil top-up trend and sampling | Separator element, scavenge line, lubricant, temperature |
| Water downstream | Dew point and drain observations | Dryer capacity, bypass leakage and drainage |
| Frequent load changes | Pressure and state timeline | Storage, pressure bands and demand variability |
| High electricity per unit of air | Power and flow at comparable duty | Unloading, restrictions, wear and sequencing |
A high-temperature trip should start a diagnosis, not a higher trip setting. A persistent low-pressure complaint should prompt a dynamic system check before anyone replaces the airend. Separate faults inside the package from faults in treatment, distribution or the consuming machine.
Annual energy and lifecycle calculations
For a hypothetical installation averaging 55 kW over 6,000 hours, annual consumption is 55 × 6,000 = 3,30,000 kWh. A measured reduction of 5 kW over those same hours is 30,000 kWh a year. Multiply by your own tariff, and remember these simple figures exclude demand charges and time-of-day tariffs.
Operating-state calculations are better when demand varies. Suppose a machine uses 55 kW for 3,000 loaded hours and 18 kW for 2,000 unloaded hours, and is off for the rest of the year:
| State | Power | Hours | Energy |
|---|---|---|---|
| Loaded | 55 kW | 3,000 | 1,65,000 kWh |
| Unloaded | 18 kW | 2,000 | 36,000 kWh |
| Total | 5,000 | 2,01,000 kWh |
The 36,000 kWh of unloaded running deserves investigation, but it is not all recoverable; control constraints and production needs decide what can be saved. Lifecycle comparison should include purchase, installation, power, treatment losses, service, consumables, repairs and the cost of interruption. Refurbished equipment needs condition evidence and realistic maintenance assumptions: a lower purchase price is attractive when the duty fits and the remaining condition is proven.
Optimise the system before buying more capacity
- Repair leaks, isolate idle branches and stop unnecessary open blowing.
- Correct restrictions in filters, hoses and undersized pipework.
- Review pressure settings and sequencing with the process team.
- Confirm that any pressure reduction preserves actuator force, product quality and safe operation.
- Consider heat recovery only where there is a real, coincident heat demand.
Industries differ. Air-jet weaving in textile mills creates high sustained flow, packaging lines create repeated peaks, and food or pharmaceutical processes impose contamination limits. Selection should reflect those differences rather than one standard package for every factory.
How Reddy Compressors helps
Reddy Compressors, Tarnaka, Secunderabad, has served industry since 2002 as an independent multi-brand specialist. We sell new and used or refurbished rotary screw compressors, rent them from our own fleet, service and overhaul them, and supply spares for ELGi, Atlas Copco, Ingersoll Rand, KAESER, Chicago Pneumatic, Sullair, Doosan, Kirloskar and other makes. We are not an authorised dealer of any brand. We have tie-ups with all major and reputed brands.
- Selection and replacement: sizing from your demand profile and pressure budget, comparing packages on FAD and specific power at the same pressure.
- Audits: flow, pressure and power logging to find unloaded running, leaks and pressure loss before you buy capacity.
- Service, AMC and overhaul: over 20 service engineers and technicians covering Telangana and Andhra Pradesh, with airend rebuild support where needed.
- Spares: separator elements, filters, lubricants and valves identified from nameplate and serial number, with fit confirmed before quoting, supplied across India.
- Rental: electric and diesel machines for breakdown cover, shutdowns and trials; for long-term projects we can also supply brand-new machines to site.
What to send us
- Required pressure at the critical consumer and the FAD you believe you need.
- Operating hours, shift pattern and how demand varies.
- Air-quality requirement (ISO 8573-1 class if known).
- Installation conditions: room size, ventilation, ambient temperature, dust.
- Electricity supply details and any continuity or standby requirement.
- For replacement or faults: model, serial number, nameplate photo and operating records.
Compare the complete package and its operating envelope
Record whether a quoted performance point covers only the compressor package or also includes dryers, cooling auxiliaries and regeneration demand. Product-family maximum pressure and maximum flow usually describe different selections; they do not establish a simultaneous operating point for the one machine offered. Ask for the selected model’s performance sheet at your pressure and its stated test conditions.
Screw air packages and process gas compressors
Screw compression is used for air, refrigeration and process-gas duties, but those machines are not interchangeable. For plant air, require delivered FAD at pressure and total package input. A gas enquiry, such as a booster or process-gas duty, also needs the gas composition, suction pressure and temperature, contaminants, allowable leakage and the approved materials and shaft sealing. Never compare a gas compressor’s swept volume directly with an air package’s delivered FAD.
Turn monitoring into a maintenance decision
Collecting trends is easy; acting on them is where most plants fall short. Decide who reviews each trend, which operating conditions allow a fair comparison and what happens after an adverse change. Useful comparisons are discharge temperature against inlet temperature, pressure differential against flow, and electrical input against operating state. Use the airend, drive, motor, filters and oil system as the record structure, but take intervals and limits from the model’s own manual. A protective trip or mandatory inspection must never be deferred because a dashboard looks normal.
Frequently asked questions
Is a screw compressor always better than a piston compressor?
No. A rotary screw package usually suits sustained industrial duty with long running hours, while a suitably rated piston compressor can be more economical for intermittent use such as small workshops or tyre inflation. Compare delivered FAD at pressure, permitted duty, maintenance needs and the energy used across loaded, unloaded and stopped hours before choosing either technology.
Does a variable speed compressor always save electricity?
No. A VSD saves energy only when demand varies and the machine spends much of its time within its efficient speed range. On a steady full-load duty a fixed-speed machine can be equally or more efficient. Use a measured demand profile and the package’s part-load curve, and check the minimum speed, before accepting any quoted saving.
Can a screw compressor run 24 hours a day?
Many industrial screw compressors are designed for continuous operation within their ratings. Suitability still depends on cooling air or water, inlet conditions, ambient temperature and following the manufacturer’s maintenance schedule. In hot, dusty Indian plant rooms, good ventilation and clean intake air matter as much as the compressor itself for reliable round-the-clock running.
Why is my screw compressor discharge temperature high?
A healthy oil-injected screw typically runs at about 75–95 °C discharge. Higher readings usually come from a fouled oil cooler or aftercooler, poor room ventilation or hot-air recirculation, low or degraded oil, a faulty thermostatic valve, a blocked oil filter or high ambient. Diagnose the cause from temperature trends rather than raising the trip setting.
What does an ISO 8573-1 Class 0 claim mean?
It refers to a declared oil-purity class, including aerosol and vapour, under the ISO 8573-1 framework and a defined test scope, normally for an oil-free compressor. It does not establish particle or moisture quality for your whole installed network. Read the certificate, its test boundary and conditions, and still specify dryers and filters for the point of use.
How do I compare the efficiency of two screw compressors?
Compare specific power: total package electrical input in kW divided by FAD in m³/min, at the same discharge pressure and reference conditions. For example, 75 kW delivering 12 m³/min gives 6.25 kW per m³/min. Include fans and auxiliaries, and for VSD machines compare several operating points weighted by the hours you expect at each.
What information should I send for a screw compressor quotation?
Send the required pressure and FAD, operating hours, how demand varies, the air-quality requirement, installation conditions, electricity supply and any standby requirement. For a replacement, add the existing model, serial number, nameplate photo and operating records. With this information we can compare new, refurbished and rental options on the same basis.
Related pages
Calculators and worked examples
These tools give indicative figures for screening, comparison and for preparing an enquiry. They run in your browser and send nothing. No prices or tariffs are assumed: enter your own to see costs. Efficiencies and other figures shown are example values: replace them with your own. Results are not a performance guarantee or a design certificate; final selection is confirmed by a service engineer against the machine data sheet and the site.
Specific power comparison
Compare two compressors on what matters over life: the electrical power needed per unit of air delivered, and what that costs a year.
The worked example below shows the method with fixed numbers. Turn on JavaScript to change the inputs.
Worked example
Inputs
- Machine A: input power (kW): 75
- Machine A: delivered flow (m³/min): 11.5
- Machine B: input power (kW): 80
- Machine B: delivered flow (m³/min): 12.6
- Running hours per year: 6,000
- Air actually needed (m³/min): 11
Result
- Machine A specific power: 6.52 kW per m³/min
- Machine B specific power: 6.35 kW per m³/min
- Energy to deliver the air needed: A: 4,30,435 kWh per year
- Energy to deliver the air needed: B: 4,19,048 kWh per year
- Energy difference: 11,387 kWh per year in favour of B
- Cost difference: Enter your electricity tariff (cost per kWh) above
Method. Specific power = input kW ÷ delivered flow (m³/min) at the same pressure and reference conditions. Annual cost = kW × hours × tariff. Use the full-load input power on the same test basis for both machines.
What to take from it. A small gap in specific power is multiplied by thousands of running hours. Compare on the same pressure and reference conditions.
Technical content reviewed by D. Srinivas Reddy, Managing Partner and service engineer, Reddy Compressors. Last updated 21 October 2026. How our engineering content is reviewed.
Load/unload cycle energy
Turn measured load and unload times (or the logged percentage of time in each state) and measured package kW into average power, annual energy, the energy spent running unloaded, and specific power based on the air actually delivered. An optional second set of times compares a change.
The worked example below shows the method with fixed numbers. Turn on JavaScript to change the inputs.
Worked example
Inputs
- Times entered as: Measured cycle times (seconds)
- Loaded package power (kW): 82
- Unloaded package power (kW): 28
- Loaded time (s per cycle, or per cent): 40
- Unloaded time (s per cycle, or per cent): 60
- Stopped time, motor off, 0 if none (s per cycle, or per cent): 0
- Power while stopped, controls only (kW): 0
- Running hours per year with this cycle pattern: 6,000
- Free air delivered when loaded, FAD (m³/min): 12.5
- After change, optional: loaded time, all three 0 = not used (s or per cent): 0
- After change, optional: unloaded time (s or per cent): 0
- After change, optional: stopped time (s or per cent): 0
Result
- Cycle time: 100 s (36 cycles per hour)
- Loaded fraction: 40%
- Unloaded fraction: 60%
- Unloaded power as a share of loaded power: 34.1%
- Average package power: 49.6 kW
- Annual energy: 2,97,600 kWh per year
- Unload energy (buys no air): 1,00,800 kWh per year = 33.9% of the annual energy
- Loaded specific power: 6.56 kW per m³/min
- Average air delivered: 5 m³/min
- Effective specific power over the cycle: 9.92 kW per m³/min
- Energy cost per year: Enter your electricity tariff (cost per kWh) above
Method. Two input modes. Cycle timing: enter measured seconds per cycle. Fraction: enter the share of time loaded, unloaded and stopped (for example 40, 60, 0, from controller loaded/running hours); no cycle time is reported in this mode. Average kW = (P_load × t_load + P_unload × t_unload + P_stopped × t_stopped) ÷ (t_load + t_unload + t_stopped); the states must not overlap. Annual kWh = average kW × the hours this pattern runs. Unload energy = P_unload × unloaded fraction × hours. Average air delivered = loaded fraction × loaded FAD; effective specific power = average kW ÷ average air delivered. Unloaded power is never assumed to be zero: enter measured package kW (unloaded read after blowdown has settled). Scenario comparison: enter the predicted times after a change (bigger receiver, wider band, auto-stop) in the “after change” fields; the same powers, FAD and hours are used and the kWh difference is shown. An auto-stop timer is modelled by moving unload time into the stopped state (check the motor’s permitted starts per hour). For different day and night patterns, run the tool once per pattern and add the results. The rapid-cycling warning below 30 s per cycle is our recommended check level. Money is shown only when you enter your own tariff.
What to take from it. A large unload-energy share, or an effective specific power well above the loaded figure, means a fixed-speed machine is running lightly loaded: look at storage, pressure band, sequencing, auto-stop or a smaller/VSD trim machine.