All brands, all models · Sales · Rentals · Service & AMC · Spare Parts · Used & Refurbished+91 99590 60718WhatsAppEmailSecunderabad / Hyderabad
REDDY COMPRESSORS

Engineering

Borewell and DTH Compressor Library

2 min read4 sections
High-duty diesel compressor engine bay
High-duty diesel-driven compressor. Representative image.

This is the working library for borewell and DTH drilling air: what the compressor must deliver, how the air travels down the string, how the hole is cleaned, and how the well is finished and tested. Use it as a map. Each page covers one decision.

The principle running through all of it: the rig reaches the formation, and the air system decides whether the hammer works and the cuttings leave the hole. Pressure runs the hammer; flow cleans the hole; losses in the string, hoses and water inflow decide how much of both reaches the bit.

Start here: duty, selection and sizing

Talk to Reddy Compressors

Tell us the job. We will send the right answer.

Buying, hiring, servicing or looking for a part: share what the air must run, the pressure and the site. A nameplate photo is often enough to start.

+91 99590 60718+91 92468 88812